Line 19: Line 19:
  
 This means that most, if not all, of the computing in the ICS Data Center will be powered down to accommodate this request. ​  We will begin powering down non-critical services on 7/​29/​2020. ​ Facilities will be providing a generator during this period keep some critical services up, but most equipment will be brought down prior to scheduled outage at 0700 on 7/​30/​2020. ​ We will begin bringing all services back online immediately after work is complete. ​  ​Priority will be placed on critical services, followed by services that impact the largest number of researchers and staff, and followed by instructional services. ​ Although we intend to have all services restored as quickly as possible, some services may take longer than expected. This means that most, if not all, of the computing in the ICS Data Center will be powered down to accommodate this request. ​  We will begin powering down non-critical services on 7/​29/​2020. ​ Facilities will be providing a generator during this period keep some critical services up, but most equipment will be brought down prior to scheduled outage at 0700 on 7/​30/​2020. ​ We will begin bringing all services back online immediately after work is complete. ​  ​Priority will be placed on critical services, followed by services that impact the largest number of researchers and staff, and followed by instructional services. ​ Although we intend to have all services restored as quickly as possible, some services may take longer than expected.
 +
 +
 +====Shutdown Schedules=====
 +
 +Hosts will be shutdown according to the following schedule beginning at 1300 (1pm) on 7/​29/​2020. ​  ​Research NFS servers will be powered off beginning at 1700 (5pm) and disk arrays will be physically powered off at that time as well.  Instructional hosts will be powered off beginning at  2200 (10pm).
  
 <​code>​ <​code>​
Line 288: Line 293:
 7/​29/​2020 17:​08:​00 SCULLY-JBOD 7/​29/​2020 17:​08:​00 SCULLY-JBOD
 7/​29/​2020 17:​09:​00 MULDER-JBOD 7/​29/​2020 17:​09:​00 MULDER-JBOD
-7/29/2020 13:33:00 GAIA +7/29/2020 17:00:00 GAIA 
-7/29/2020 14:13:00 ABZU+7/29/2020 17:00:00 ABZU
   
  Instructional Lab  Instructional Lab