ICS Server Update and Reboot Schedule

The following ICS servers will be updated and reboot at the times noted below:

Hostname Service Maint Window Begin Maint Window Duration
adrian-monk-v11.ics.uci.edu puppet4 3/22/2021-0900 2 hours
adrian-monk-v9.ics.uci.edu nagios 3/22/2021-900 2 hours
broadchurch-v1.ics.uci.edu digphenotypes 3/22/2021-0900 2 hours
colin-baker-v0.ics.uci.edu puppet6-2 3/22/2021-0900 2 hours
colin-baker-v1.ics.uci.edu colin-v1 3/22/2021-0900 2 hours
colin-baker-v3.ics.uci.edu N/A 3/22/2021-0900 2 hours
columbo-v2.ics.uci.edu ftp0 3/22/2021-0900 2 hours
kate-beckett-v5.ics.uci.edu mda1 3/22/2021-0900 2 hours
melvil-dewey-v1.ics.uci.edu rt4-1 3/22/2021-0900 2 hours
nancy-drew-v2.ics.uci.edu drew-v2 3/22/2021-0900 2 hours
nancy-drew-v4.ics.uci.edu drew-v4 3/22/2021-0900 2 hours
richard-castle-v6.ics.uci.edu rt4-2 3/22/2021-0900 2 hours
rockford-v2.ics.uci.edu vpn001 3/22/2021-0900 2 hours
rockford-v4.ics.uci.edu imap0 3/22/2021-0900 2 hours
rockford-v6.ics.uci.edu vault0 3/22/2021-0900 2 hours
rockford-v8.ics.uci.edu ipa2 3/22/2021-0900 2 hours
sakura-v4.ics.uci.edu logstash0_elk 3/22/2021-0900 2 hours
sasuke-v4.ics.uci.edu metrics_grafana 3/22/2021-0900 2 hours
kate-beckett-v3.ics.uci.edu control 3/22/2021-1700 2 hours
addison-v4.ics.uci.edu emp7-1 3/22/2021-1700 2 hours
adrian-monk-v1.ics.uci.edu sge-sm0 3/22/2021-1700 2 hours
addison-v3.ics.uci.edu imap1 3/22/2021-1700 2 hours
nancy-drew-v5.ics.uci.edu mailman-mta0 3/22/2021-1700 2 hours
naruto-v4.ics.uci.edu data_collection_prometheus 3/22/2021-1700 2 hours
paul-mcgann-v0.ics.uci.edu SGE-Master 3/22/2021-1700 2 hours
richard-castle-v0.ics.uci.edu puppet master 3/22/2021-1700 2 hours
richard-castle-v1.ics.uci.edu ganglia 3/22/2021-1700 2 hours
richard-castle-v5.ics.uci.edu loghost0 3/22/2021-1700 2 hours
rockford-v1.ics.uci.edu emp7-2 3/22/2021-1700 2 hours

Kubernetes Cluster Upgrade

  • Downtime Notice: #78583: Upgrade Kubernetes Clusters
  • Date: March 22nd , 2021
  • Duration: All week beginning at 0600 and lasting approximately 8 hours

IMPACT: The Kubernetes clusters are built with redundant nodes so overall service should not be disrupted. Some users may notice pods or instances disconnecting and rebooting as they are migrating from one node to another.

Engineering Tower Generator ATS repair On Jan 30th

  • Downtime Notice: #78155 : ICS Data Center Power Event: Engineering Tower Generator ATS repair
  • Date: January 30th, 2020
  • Duration: Beginning at 0600 and lasting approximately 8 hours

Campus facilities scheduling an electrical power shut down for the ICS building on 1/30/2021 in order to effect repairs on a failed generator automatic transfer switch.   

Network: Power will be temporarily reconfigured to make sure all ICS network equipment remains powered during this period.

Computing: We do not anticipate downtime on any ICS computing during this period.

Environment: One of three 20 ton air conditioners will be unavailable during this period. Portable cooling units will be used to supplement the remaining air conditioners. If the portable cooling units prove unable to maintain a reasonable operating temperature we will begin shutting down non-critical infrastructure followed by hosts generated the greatest amount of heat (e.g. GPU clusters).

OIT: OIT will be mirroring our efforts to make sure that their equipment in the building is available during this period.

Although we will do our best to avoid downtime during this period, there are many factors that can intersect unexpectedly to cause an outage. Please send email to helpdesk@ics.uci.edu if you are concerned that this work will cause a hardship on your research and we will work with campus facilities to do our best to accommodate.

Last Quarter

projects/maint-winter-2021.1615841899.txt.gz · Last modified: 2021/03/15 13:58 by Hans
CC Attribution-Noncommercial-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0